The party of the equipment Soiled Turbing CPG was transferred PDNG, combined with the existing group in PDNG Soiled Turbing and reorganized into a separate plot for the operation of the installation of flexible pipes Coiled Tubing;
repair shop and installation of submersible equipment (TsRiMPO) PDNG MEP was transferred and merged with the department repair of oilfield equipment (TSRNPO);
đang được dịch, vui lòng đợi..