1. check the positioning of the line сертификтам.
2. cut to length with припусками template design for fur. processing.
3. clean the welding to the left and check method of mpi.
4.to verify the absence of moisture and pollution in the zone of the welds.
5. man 1: install and detail. 1
6. secure zone of welded joints of slag and spatter, spell.
7. to perform the opc and mpi.
8. to restore the akp.
đang được dịch, vui lòng đợi..